The Cube

Architect: Make Architects

Main Contractor: BuildAbility

Ceiling Contractor: CG Reynolds

Standing tall on the architectural world stage, The Cube has transformed Birmingham’s skyline.

Situated in the thriving Westside district of the city centre neighboring The Mailbox the building stands on a perfect 52.5m x 52.5m square footprint.

Inside this fascinating “jewellery box” is a rich mix of slick residential apartments, exclusive retail, extensive office space, boutique hotel and the city’s first rooftop restaurant.

Burgess CEP worked closely with Make Architects to choose a ceiling tile that was suitable for external use, with the emphasis being that the ceiling tile was capable of withstanding both weather conditions and wind loading.

To meet this design brief we supplied External Clip-in1200 x 600mm unperforated planks which where installed throughout the external walkways and the underside of escalators.

We also supplied standard sized metal ceiling tiles from their Tegular range to the Highways Agency which is located on floors 9-11.

CG Reynolds was chosen as the ceiling contractor as they have extensive experience of installing our products.